Read Time:19 Second
Adever completes the £500,000 refurbishment of Bryn Beryl Hospital Pwllhelli.
![](https://adever.co.uk/wp/wp-content/uploads/2019/07/ward1.jpg)
![](http://adever.co.uk/wp/wp-content/uploads/2019/07/GRP.jpg)
The works were completed in two phases with the hospital maintaining it’s operation capability throughout the works. The works enabled the hospital to combine it’s separate wards into a single 23 bed unit. The works also including building a Medical Gases Shed and a link corridor to improve access within the hospital.