Venue Cymru

Location: Llandudno, North Wales
Type: Commercial
Value: £2,800,000
Duration : 12 Weeks
The overall works were split over several works packages. The overall aim of the works was to transform the existing accommodation, maximising use of the entire building, improving layout and improving the quality of spaces for all users. It was imperative however, that the building maintained an operational venue at an appropriate level of service throughout the construction process, accommodating the staff and visitors. To respond to this requirement, Adever phased the work.
The following phases are listed below.
•Orme Suite – Removal of pillars, creation of new entrance, relocation of bar and reorganisation of back of house area.
•New Stairwell and Lift – Infill of stairwell and demolition and re-location of lift
•Divisibility of the Hall – Installation of 7m high folding acoustic partitions and removal of corridor.
•St David’s Room – New folding acoustic wall.
•Wind Tunnel – Provide internal floor for storage.
•Meeting Rooms – Amend office spaces throughout the building.
•Arcadia Room Alterations – Changes to provide alternative entrance.
•Atrium Front Wall – Alterations to extend front wall to enclose the under croft.
•Second Floor Function Room – Provide new building over loading bay.
Although this work was phased the majority of the works comprised in the creation of a new link building over a loading bay for HGV deliveries which was carried out for the full 52-week duration of the project. This new building consisted of a large steel frame on top of pile foundations, a under croft second floor dance studio with sprung floor, a steel stair fire escape, and large passenger lift.